We were gone for most of the week and a lot of things have changed! It was our first stop once we got back into town, we didn't even go home first! (Well, maybe we did, in a way!)

No garage door yet, but the other exterior doors and windows are all in. The roof and all of the siding is complete. They started drywalling Thursday. When we visited today (Sunday) the drywalling looks finished.

The living room, kitchen, front entry, and Shannon is standing in the hallway looking into the coat closet.

Camille's room. Her closet (huge!) is to the right. The door at the back leads to the hallway.

Master bathroom. I tried taking pictures of the master bedroom, but there just isn't anything to really see, except lots of doorways. I also took a pic of the garage, but I can't get the whole garage into the picture and I figure you're tired of reading about it anyway!
Judging by the house next door, we should have a drywall inspection in the next day or two. Then they'll tape over the windows and spray spackle, then paint. Then clean up, smooth the floor, and get ready to start laying flooring.
Our walk-through is now just 5 weeks away! Then closing is a week later. We'll be giving notice to our landlord pretty soon. I can't believe we're getting so close.